University of Botswana 450 Bed Academic Teaching Hospital

The University of Botswana Academic Hospital is located within the main campus in Gaborone. The Hospital building is a Multi-storey Structure having a gross floor area of approximately 72,000m2 housing 450 beds, 13 operation theatres and various hospital departments, wards, laboratories and support functions.

The Electrical engineering services have been designed to comply with the recommended standards and statutory regulations. The systems included in the electrical services installation and reticulation works for the academic hospital include but not limited to are, HV Utility power intake, Uninterrupted power supply systems, LV distribution, Electrical Cableways, Earthing and Lightning protection system, Interior and Exterior lighting, Small power distribution & power supplies to HVAC equipment, Fire Alarm system which includes Voice Evacuation & Public Address systems, Audio Visual system, Security system (CCTV and Access control), Specialist Hospital equipment (Operating Theatre lighting, Surgical Luminaire pendants, Operating theatre, ICU and Procedure service pendants, X-ray Viewing boxes, Examination lights, Operating Theatre Technical Wall panels, Bedhead Trunking and Nurse Call systems).   

Hall way (waiting areas)


Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player


The following where the Consultants & main Contractors;

Architects:

B&M & Rabasha Sampson Architects Botswana

Electrical engineer:

North Atlantic Engineering Consultants

Mechanical engineer:

North Atlantic Engineering Consultants

Main Contractors:

Zhengtai Group

Value for project;

BWP 250 million

Of Electrical Works

       

SHARPS ELECTRICAL (PTY) LTD

Head Office:
Plot No.1235
Haile Selassie Road,
Gaborone,
Botswana

Keeping an honest
relationship with customers
since 1967.
Striving to be the best in the industy
Contact us